Next
The work in progress or up next, and where each piece stands.
| Work | Issue | Where it stands |
|---|---|---|
| Demos for every target | #69 | Web, CLI, TUI, desktop and the Omarchy panel run |
| Desktop apps | #41 | Electrobun picked, with the demo and docs; System Bridge evaluates it in system-bridge#4568 |
| Bring your own theme | #68 | Stored locally; storage on the host waits on apps on Groundwork |
| Framework wrappers | #66 | The manifest and Lit are done; React, Vue or Svelte once an app needs one |
| First apps on Groundwork | #44 | Planned |
| Apply labels from the manifest | #49 | Waits on the update rework |
| Rename docs-kit | #55 | After the design work |